

How to Scope a Multi-Trade Construction Contract for a Remote Community Build
A remote community construction contract succeeds or fails at the scoping stage. The scopes that hold up define the work by outcome rather than by trade, name a single party accountable for the interfaces between trades, tie the schedule to access windows rather than to calendar dates, and state cle
1 day ago6 min read


Wet Basement in Winnipeg: Where the Water Is Actually Coming From
Water in a Winnipeg basement almost always arrives one of four ways: over the ground and down the foundation wall, up through a failed or clogged weeping tile system, in through a crack in the wall or floor, or backward through the sewer connection. Each one has a different fix, and the reason so ma
4 days ago7 min read


Why Concrete Cracks in Manitoba and What Actually Prevents It
Most concrete failure in Manitoba is not a concrete problem. It is a base problem, a drainage problem, or a control joint problem. Concrete poured on properly compacted granular fill, jointed correctly, and kept out of standing water will hold up through decades of freeze and thaw. Concrete poured o
Sep 107 min read








